Quakertown, Bucks County

Level 5 drywall finish in Quakertown, PA.

A deep color shows a wall's flaws even in flat paint. In Richland Township's newer houses that is a drywall question; in the borough's stone and brick houses it is usually a plaster one.

A living room painted deep charcoal, with white window trim and a white fireplace surround; sunlight falls across dark hardwood floors.
Charcoal walls in window light.

Level 5 drywall finish for Quakertown homes

Richland Township, which surrounds the borough, built about three in ten of its homes in the 2000s alone and more than two-thirds since 1980. Drywall in houses of that age was most likely finished to Level 4, where most drywall lands, and under a pale flat paint its seams have stayed quiet. The trouble starts when the color changes.

Strong, deep hues magnify imperfections even in flat paint, the drywall standard notes, so a family room going to charcoal or a dining room to deep green is the moment to look at the walls in side light first. Bare new board can be finished to Level 5; painted walls get the same even face from a skim coat over the whole surface.

Quakertown

Dark walls in Richland Township, deep color on borough plaster

Richland is still adding houses; about 4 percent of its homes date from 2020 or later. For a house still at bare board, the time to ask for Level 5 is before primer, especially in rooms meant for a dark color. For a house from the 2000s that has been painted, the work is a skim coat, wall by wall, under the colors that need it, starting with the walls a window lights from the side.

Masonry is what the borough is built of. Its historic district, which takes in most of the town, favors stone and brick, some of it stuccoed, in large, square houses of two and a half stories, with twins and rows among them, and more than a quarter of its homes predate 1940. Inside, the walls are plaster, and a deep period color in a Queen Anne parlor or a Foursquare dining room goes onto plaster that has been repaired and skimmed, not onto Level 5 drywall.

A smooth, freshly finished white wall meeting a wood floor, light raking along its length.
A finished wall in raking light.

Worth knowing

  1. One dark wall

    A single deep-colored wall is a contained job. It can be skimmed corner to corner on its own, leaving the pale walls around it as they are.

  2. Look in side light first

    Before choosing a dark color, see the wall when light crosses it at its lowest. Joints that show as faint bands then will show more under darker paint.

  3. Masonry walls, plaster faces

    In the borough's stone and brick houses, plaster on the outer walls cracks where the masonry moves. Those cracks are repaired before any skim, or a dark color will trace them.

The work

How the work goes

The same care on every job, in every town. The full guide to level 5 drywall finish.

A room in an older house with its walls patched and part-way through a skim coat, a radiator cover under the window.
Walls part-way through a skim coat.
  1. A walkthrough in the room’s light

    Randy walks the rooms with you and says which walls need Level 5 and which don’t. It helps to look at the hour the light is hardest. The walkthrough and written estimate are complimentary.

  2. Joints finished to Level 4

    Tape is bedded in compound at every joint; flat joints get two more coats, inside corners one, screw heads three. Each coat dries hard before the next, with the house kept warm and steady.

  3. A skim coat, edge to edge

    Compound is spread over the entire surface and wiped back tight with a wide knife or trowel, leaving a thin film over paper and joints alike. Where one pass doesn’t cover, a second follows.

  4. Sanded, then primed

    The dry surface is sanded smooth without scuffing the paper beneath. Primer goes on before any color, so the finish coats absorb evenly across the whole wall.

  5. Judged in its own light

    Finish coats go on last. The standard’s test is the one that counts: the wall seen from five feet back, under the light the room will actually have.

Questions

Level 5 drywall finish, Quakertown.

We want to paint a family room in our Richland Township house charcoal. Does the drywall need Level 5 first?

If it is new board, finishing it to Level 5 before the primer is the surest course. If it has been painted, a skim coat over the whole wall gives the same even face. Under a color that dark, a wall finished only to the common standard tends to show its joints wherever light crosses it.

Our borough house is stone with plaster walls. Can it take a dark color?

Yes, once the plaster is sound and true. Cracks and loose areas are repaired, the walls are skimmed, and a primer evens out the patches so the dark finish lands on one consistent surface. The aim is a sound, even wall, not a sheet of drywall.

Are the twins and row houses in the borough plaster or drywall inside?

The rows and doubles built in the trolley years after 1896 began as plaster, since that was the standard wall until the 1930s or 1940s. Later remodels may have added drywall rooms or patches, and where the two meet under a deep color, both are skimmed so they take paint alike.

Consultation

Request a private consultation.

Private walkthrough & written estimate, complimentary. Tell us a little about the house and the rooms, and Randy will be in touch to arrange a time.

Hours
Monday – Friday8:30 AM – 5:30 PMSaturday10 AM – 3 PMSundayClosed
Service area
Easton, Bethlehem, Allentown and the greater Lehigh Valley; Bucks County, Pennsylvania.

Fully insured — proof on request. Residential and commercial.

Randy’sPainting & DrywallReply card
The project
Preferred contact

Walkthrough & written estimate, complimentary.